Projects

Education

Westmoore High School, Moore OK

In 1998, Westmoore High was hit with an F-5 Tornado. Project Managed and wrote SOW, which included dehumidification and long-term climate control of 400,000 sq. ft. Designed a dehumid- ification protocol and a long-term temporary HVAC control system to prevent the structure from molding during the restoration. The project was completed in four months.